1. Before Auto Generate



Before using the Auto Generate function, it is important for user to CHECK the following:

  • Generate Constraint at Group folder (at Tree).
  • Constraint Options.
  • Exclude Sections that Do Not want to be Generated. Include Sections that want to be Generated first. This is for those who practice Priority Generate/Slot in.
  • Double Check Section Status.
  • Exclude Slots at Timetable Output.