1. Before Auto Generate

Before using the Auto Generate function, it is important for user to CHECK the following:
- Generate Constraint at Group folder (at Tree).
- Constraint Options.
- Exclude Sections that Do Not want to be Generated. Include Sections that want to be Generated first. This is for those who practice Priority Generate/Slot in.
- Double Check Section Status.
- Exclude Slots at Timetable Output.