1. Set Constraints


Before all sections are being slotted into the timetable Structure, it is important to set the constraints according to the specified demands.

User can set constraints according to the following:

  • Constraints Option
  • Group Constraints 
  • Lecturer Constraints
  • Room Constraints
  • Merge Group Constraints
  • Same Time Group Constraints
  • Batch Group Constraint